Reference

  • 2022 – 2023 Installation of pipelines, steel structure and equipment - Elbehafen LNG Terminal Phase 1 – Brunsbuttel, Germany.
  • 2022 – 2023 Manufacture, dismantling and assembly of equipment, heat exchangers, machines, apparatus, containers, pumps, fittings, compensators, pressure gauges, profile steel, pipelines, opening and closing apparatus in accordance with the technical design documents – BAYERNOIL Raffinerie Vohburg an der Donau, Gemany
  • 2022 – 2023 Manufacture, dismantling and assembly of equipment, heat exchangers, machines, apparatus, containers, pumps, fittings, compensators, pressure gauges, profile steel, pipelines, opening and closing apparatus in accordance with the technical design documents. – Gunvor Raffinerie Ingolstadt GmbH, Gemany
  • 2022 – 2023 Project Assembly and pre-assembly of pipelines in Mexico, Wärtsilä Finland Oy, Baja California, Mexico
  • 2022 – 2023 Manufacture, dismantling and assembly of equipment, heat exchangers, machines, apparatus, containers, pumps, fittings, compensators, pressure gauges, profile steel, pipelines, opening and closing apparatus in accordance with the technical design documents. –PCK Raffinerie GmbH, Gemany
  • 2022 – 2023 Maintenance in the chipboard plant, Diffenbacher/Puren GmbH, Obermarchtal, Gemany
  • 2022 – 2023 Manufacture, dismantling and assembly of equipment, heat exchangers, machines, apparatus, containers, pumps, fittings, compensators, pressure gauges, profile steel, pipelines, opening and closing apparatus in accordance with the technical design documents, - Knauf Ceiling Solutions GmbH & Co. KG, Grafenau, Germany
  • 2022 – 2023 Maintenance in the chipboard plant, Swiss Krono SAS, Sully sur Loire, France
  • 2021 – 2023 Maintenance work in the field of pipeline construction, Südzuker Werk Plattling, Germany
  • 2021 – 2023 Project Assembly and pre-assembly of pipelines, Boehringer Ingelheim GmbH, Ingelheim am Rhein, Germany
  • 2021 – 2023 Manufacture, dismantling and assembly of equipment, heat exchangers, machines, apparatus, containers, pumps, fittings, compensators, pressure gauges, profile steel, pipelines, opening and closing apparatus in accordance with the technical design documents, Wärtsilä, Groizia, Italy
  • 2021 – 2023 Filter Technology – Installation EF-210034-P001 GNA-SCM, Service Center Metals, Prince George, Virginia USA
  • 2021 – 2023 Maintenance work in the field of pipeline construction, Inovyn Rheinberg, Gemany
  • 2021 – 2023 Assembly of system components for the construction project in the BMW (Auto industry) plant - battery pilo system Parsdorf, Gemany
  • 2022 – 2023 Installation of pipelines, steel structure and equipment - Butterfly project, Krefeld, Germany.
  • 2020 - 2023 Project DREWAG Heizkraftwerk Dresden –Reick, Germany
  • 2020 – 2023 Manufacture, dismantling and assembly of equipment, heat exchangers, machines, apparatus, containers, pumps, fittings, compensators, pressure gauges, profile steel, pipelines, opening and closing apparatus in accordance with the technical design documents – Chemiestandort Leuna, Gemany
  • 2021 - 2023 Project Installation and piping of 3 parallel thermal oil heater systems/evaporator systems, DuPont Luxemburg S.A
  • 2016 - 2023 Maintenance in the chipboard plant, EGGER LLC, Lexington, NC,USA
  • 2016-2020 New construction of wood chips processing plant, Kronospan CRO, Bjelovar, Croatia
  • 2016–2022 Pipeline prefabrication -workshop, Eddelak, Germany.
  • 2016–2022 Maintenance in the paper mill -Osnabrück, Germany.
  • 2020-2023 Mechanical assembly of the complete pickling lines at the strip treatment plant, Aperam-Stainlesse, Genk, Belgium
  • 2020-2021 Installation of the steam turbine pipeline, Volkswagenwerk, Kraftwerk Süd, Wolfsburg, Germany
  • 2019-2020 Maintenance in the chipboard plant, Kronospan LLC,Eastaboga, Alabama, USA
  • 2019–2020 Assembly of steel structures, machines in the factories of Baumit GmbH Coldizt, Germany.
  • 2019-2020 Repair of the forming station for the supply of wood chips in the wood industry -Sandebeck, Germany.
  • 2019–2019 Laying the main gas pipeline 150 m -DN 150, Kronospan CRO, Bjelovar, Croatia
  • 2019-2019 Revitalization of the air compressor in the Kronospan Clarion Boards LLC particle board plant in Pennsylvania, USA
  • 2018–2019 Assembly of steel structures, machines and pipes in the Knauf Illangeplant, France.
  • 2018-2019 Installation of a hydrant pipeline in the new plant in the Eastaboga plant of Kronospan LLC, Alabama, USA.
  • 2018-2019 Repair of the thermal oil pipeline in the acrylic sheet production plant in the Kronospan CZ factory in Jihlava, Czech Republic.
  • 2018-2018 Repair of the forming station in the parquet production facilities in the Kronospan Clarion Boards LLC, Pennsylvania USA plant